Hillwood · Dorsten
Description
Developed on a brownfield site, this warehouse in Dorsten offers a total of approx. 17 000 m² of modern storage space in the Dorsten-Hervest industrial area. The floor space is divided into two units, which can also be used separately. The location near the town is well connected to the A52 and A31 motorways.
Thanks to clever architectural design, fabrikon was able to create approximately 1 500 m² more warehouse space on the site than originally planned.
Project data
Client
                    Hillwood Germany
                Location
                    Dorsten, North-Rhine Westphalia
                Project size
                    Hall area
                        16,800 m²
                    Office and social space
                        700 m²
                    Mezzanine area
                        1,280 m²
                    Sustainability
                    
Brownfield
                                                            
Water protection
                                                             
                             
                             
                             
                             
                             
                            